Last updated: Aug 12, 2025, 01:09 PM UTC

HireBest Phase 1 Deliverables Checklist

Project: AI Consultant Proof of Concept
Duration: 2 Weeks
Budget: $4,000


Core Deliverables

1. Virtual AI Consultant System

  • Trained AI Model

    • Ingested onboarding deck
    • Learned consultant methodology
    • Incorporated Bubble app prompts
    • Tuned for HireBest voice/style
  • Consultant Behavior Demonstration

    • Analytical thinking patterns
    • Professional report writing
    • Industry-specific insights
    • Recommendation generation

2. Comparative Analysis Reports

  • Project 1 Analysis

    • AI-generated consultant report
    • Human consultant report (provided)
    • Side-by-side comparison
    • Quality score (target: 80%+)
  • Project 2 Analysis

    • AI-generated consultant report
    • Human consultant report (provided)
    • Variance documentation
    • Improvement metrics
  • Project 3 Validation

    • AI-generated consultant report
    • Accuracy assessment
    • Final quality validation

3. Pattern Recognition Outputs

  • Theme Extraction Report

    • Common themes across all projects
    • Recurring recommendations
    • Industry-specific patterns
    • Success factor identification
  • Healthcare Industry Analysis

    • Healthcare-specific challenges
    • Comparison with other industries
    • Unique recommendation patterns
    • Risk factors identification
  • Interview Question Bank

    • Questions for healthcare companies
    • Industry-agnostic questions
    • Red flag identifiers
    • Executive assessment questions

4. Technical Infrastructure

  • Web Upload Interface

    • Secure document upload
    • File type validation
    • Progress tracking
    • Error handling
  • AWS Bedrock Configuration

    • Model deployment
    • Security settings
    • Performance optimization
    • Cost management setup
  • Private Server Environment

    • Sliplane hosting configured
    • US-based deployment
    • Access controls implemented
    • Monitoring established

5. Documentation Package

  • Security & Privacy Framework

    • Complete security architecture
    • Privacy compliance documentation
    • Data handling procedures
    • HIPAA-ready configuration guide
    • Incident response plan
  • Technical Documentation

    • System architecture diagram
    • API documentation
    • Configuration guide
    • Troubleshooting guide
  • User Documentation

    • Upload interface guide
    • Report generation instructions
    • Best practices guide
    • FAQ document

6. Executive Intelligence Foundation

  • Kickoff Document Analysis

    • CIM processing capability
    • Company website extraction
    • Executive identification
    • Key risk identification
  • "Watch For" Lists

    • Red flags checklist
    • Opportunity indicators
    • Risk factors
    • Success predictors

Success Criteria Validation

Functional Requirements

  • AI produces consultant-quality analysis
  • Reports achieve 80%+ match to human output
  • System identifies themes across projects
  • Pattern recognition works for healthcare
  • Upload interface functions smoothly

Technical Requirements

  • AWS Bedrock properly configured
  • Security measures implemented
  • Data encryption active
  • Audit logging operational
  • Performance meets expectations

Business Requirements

  • Mike approves output quality
  • Time savings demonstrated
  • Scalability path clear
  • ROI justification documented
  • Phase 2 roadmap defined

Additional Deliverables

Training & Knowledge Transfer

  • Mike training session (2 hours)
  • System walkthrough video
  • Troubleshooting guide
  • Best practices documentation

Project Management

  • Daily progress reports
  • Risk mitigation log
  • Issue resolution tracking
  • Final project summary

Acceptance Criteria

Required for Sign-off

  1. All core deliverables complete
  2. 80%+ quality score achieved
  3. Security documentation approved
  4. Mike confirms value delivery
  5. Phase 2 roadmap accepted

Quality Metrics

  • Report Accuracy: β‰₯ 80%
  • Theme Identification: β‰₯ 90%
  • Processing Time: < 5 minutes per report
  • System Uptime: 99.9% during POC
  • User Satisfaction: Approved by Mike

Phase 2 Foundation (Prepared but Not Implemented)

Roadmap Documentation

  • Full file system integration plan
  • LinkedIn/social media integration design
  • Fable system integration approach
  • Production deployment strategy
  • Scaling architecture

Cost Estimates

  • Phase 2 development costs
  • Infrastructure requirements
  • Ongoing maintenance pricing
  • ROI projections
  • Timeline estimates

Handover Package

Final Delivery Items

  • All source code (if applicable)
  • Configuration files
  • Documentation package
  • Training materials
  • Support contact information

Post-Project Support

  • 30-day warranty on deliverables
  • Bug fix commitment
  • Question support (up to 5 hours)
  • Phase 2 planning assistance

This checklist ensures all promised deliverables are completed and validated before project closure. Each item must be checked off for successful Phase 1 completion.